YUAN Bao-jun, WANG Yi-heng, ZHOU Ding-heng. Parameters Analysis and Monitoring of Shield Undercrossing Existing TunnelJ. Transactions of Beijing institute of Technology, 2016, 36(S2): 159-163. DOI: 10.15918/j.tbit1001-0645.2016.增刊2.037
Citation: YUAN Bao-jun, WANG Yi-heng, ZHOU Ding-heng. Parameters Analysis and Monitoring of Shield Undercrossing Existing TunnelJ. Transactions of Beijing institute of Technology, 2016, 36(S2): 159-163. DOI: 10.15918/j.tbit1001-0645.2016.增刊2.037

Parameters Analysis and Monitoring of Shield Undercrossing Existing Tunnel

  • Soil warehouse pressure, synchronous grouting pressure and volume, shield thrust and advance speed of shield tunnel undercrossing existing tunnels were summarized. Existing tunnels deformation was analyzed. Conclusions are as follows. Firstly, soil warehouse pressure, synchronous grouting pressure and volume are main factors affecting existing tunnel deformation and control parameters for shield crossing. Secondly, soil warehouse pressure should be 1.5 to 1.8 times of static earth pressure and a little smaller than passive earth pressure. Thirdly, synchronous grouting pressure should be controlled in the range of formation pressure value and grouting volume should be 1.5 to 1.8 times of shield end clearance. Finally, advance speed should be in a low and uniform state.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return